Central Power Station, Puget Sound Naval Shipyard, Bremerton, Kitsap County, WA
Summary
Significance: The Central Power Station at Puget Sound Naval Shipyard was constructed in 1910 as the Shipyard's first Central Steam/Power Station. It was the principal power plant for the buildings and equipment of the industrial yard. Until the construction of the West End Boiler Plant (Building 351) in 1918 it was the sole power plant at the Shipyard. It was therefore an important facility in the early operations of the Shipyard, although not directly related to the repair and construction work.
Survey number: HABS WA-178
Building/structure dates: 1910 Initial Construction
Tags
Date
1910 - 1980
Contributors
Historic American Buildings Survey, creator
Location
bremerton, 47.56732, -122.63294
Source
Library of Congress
Copyright info
No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html