Cove Hydroelectric Development, Screen House & Intake, Cove Power Plant Road, Grace, Caribou County, ID
Summary
Significance: The screen house represents an original component of the Cove Hydroelectric Development and the intake point for water flowing into the canal and flume system. The screens played an important role in filtering debris that could become lodged in the Taintor gates and penstock or cause damage to the wooden flume or Francis turbine.
Survey number: HAER ID-43-B
Building/structure dates: 1916-1917 Initial Construction
Building/structure dates: ca. 2006 Demolished
Tags
Date
1969 - 1980
Contributors
Historic American Engineering Record, creator
Phoenix Construction Company (General Contractor), builder
McClelland, R. J., Chief Engineer
Rocky Mountain Energy
SWCA Environmental Consultants, contractor
Ellis, Sheri Murray, project manager
Christianson, Justine, transmitter
Location
Grace, 42.52476, -111.79470
Source
Library of Congress
Copyright info
No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html