Cove Hydroelectric Development, Upper Gate House, Cove Power Plant Road, Grace, Caribou County, ID
Summary
Significance: The Upper Gate House contained the Tainter gate that controlled the volume of water flowing through the Cove system.
Survey number: HAER ID-43-F
Building/structure dates: 1916-1917 Initial Construction
Tags
Date
1969 - 1980
Contributors
Historic American Engineering Record, creator
McClelland, R J, Chief Engineer
Phoenix Construction Company, builder
Rocky Mountain Energy
SWCA Environmental Consultants, contractor
Ellis, Sheri Murray, project manager
Christianson, Justine, transmitter
Location
Grace, 42.52476, -111.79470
Source
Library of Congress
Copyright info
No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html