Hoover Dam, Arizona-Nevada Switchyard, U.S. Highway 93, Boulder City, Clark County, NV
Summary
Significance: It is one of six switchyards built between 1935 and 1952 to provide terminals for major transmission lines carrying electricity to markets in California, Nevada, and Arizona. All of these facilities were built by the Bureau of Reclamation as elements of the Boulder Canyon Project, and Reclamation documents referred to the entire complex of switchyards as "Boulder Switchyard." The Arizona-Nevada Switchyard is therefore a contributing element of the switchyard complex that was a major feature of the Hoover Dam development and contributed to the historical significance of the complex.
Survey number: HAER NV-27-F
Building/structure dates: after. 1949- before. 1953 Initial Construction
National Register of Historic Places NRIS Number: 81000382
Tags
Date
Contributors
Location
Source
Copyright info