Mystic Lake Hydroelectric Facility, Electric Transmission A Line, Along West Rosebud Creek, Fishtail, Stillwater County, MT
Summary
Survey number: HAER MT-130-A
Building/structure dates: 1923 Initial Construction
Tags
Date
1969 - 1980
Contributors
Historic American Engineering Record, creator
Montana Power Company, Builder
Corning Glass Works, glass insulators
Padilla, Mary, transmitter
Renewable Technologies, Inc., contractor
Location
Roscoe, 45.37050, -109.57413
Source
Library of Congress
Copyright info
No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html