Part of PICRYL.com. Not developed or endorsed by the Library of Congress
Penobscot Bridge, Spanning Penobscot River at Route 15, Bangor, Penobscot County, ME

Similar

Penobscot Bridge, Spanning Penobscot River at Route 15, Bangor, Penobscot County, ME

description

Summary

Significance: This bridge is the last remaining Baltimore (Petit) through-truss bridge in the state. The current structure represents three different phases of construction: Phase 1 - the center span was erected in 1902 by the American Bridge Co. to replace the center wooden covered section lost in spring flooding; Phase 2 - the spans at either end of the center span were added in 1911 by the Boston Bridge Works Co. to replace the remaining wooden covered bridge section; and Phase 3 - three pony trusses (no longer extant) were erected at the west end of the existing structure; replaced with a steel girder truss section in 1934 and 1963.
Unprocessed Field note material exists for this structure: N1503
Survey number: HAER ME-52
Building/structure dates: 1902 Initial Construction
Building/structure dates: 1911 Subsequent Work
Building/structure dates: 1934 Subsequent Work
Building/structure dates: 1969 Subsequent Work
Building/structure dates: 1963 Subsequent Work

date_range

Date

1969 - 1980
person

Contributors

Historic American Engineering Record, creator
American Bridge Company
Boston Bridge Works
place

Location

create

Source

Library of Congress
copyright

Copyright info

No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html

Explore more

vehicular bridges
vehicular bridges