Part of PICRYL.com. Not developed or endorsed by the Library of Congress
Wellton-Mohawk Irrigation System, Relift Station, Texas Hill Canal 2.5, Northern Terminus of Avenue 51 East, approximately .5 mile south of Union Pacific Railroad, Wellton, Yuma County, AZ

Similar

Wellton-Mohawk Irrigation System, Relift Station, Texas Hill Canal 2.5, Northern Terminus of Avenue 51 East, approximately .5 mile south of Union Pacific Railroad, Wellton, Yuma County, AZ

description

Summary

Significance: With the completion of the irrigation system, Colorado River water was delivered to previously arid lands in the lower Gila River Valley. Construction of the Texas Hill Canal began in July 1955 and was completed in October 1956. The engineers designed the gravity-fed system to carry water up the Gila River Valley, opposite the river's flow. This required several large and small pumping stations along the canal to compensate for elevation changes. Although not individually eligible for listing in the National Register of Historic Places, the relift station contributes to the function and significance of the Wellton-Mohawk irrigation system.
Survey number: HAER AZ-68-D
Building/structure dates: 1956 Initial Construction

date_range

Date

1969 - 1980
person

Contributors

Historic American Engineering Record, creator
place

Location

create

Source

Library of Congress
copyright

Copyright info

No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html

Explore more

irrigation canals
irrigation canals