Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More
Hughes Aircraft Company, Processing & Electronics Building, 6775 Centi...
Significance: Construction of the original portion of Building 5, the first building of the Culver City complex, was begun in January and completed by the weekend of July 4th, 1941, when the Hughes Aircraft Com... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
The Boeing Company, 7755 East Marginal Way South, Seattle, King County...
Significance: Boeing Plant 2 assembly buildings 2-40 and 2-41, and the two associated warehouses, 2-31 and 2-44, are significant for their direct association with the World War II defense industry, specifically... More
Hughes Aircraft Company, Assembly & Manufacturing Building, 6775 Centi...
Significance: Containing more than 400,000 square feet, Building 6 is the largest building within the Hughes complex. Located immediately south of Building 5, to which it is connected via a tunnel, Building 6 ... More
Pittsburgh & Lake Erie Railroad, Locomotive Repair Shops, River Road a...
Significance: This complex was built for the maintenance of the Pittsburgh & Lake Erie Railroad's steam and later diesel locomotives in 1903. The surviving structures reflect the industrial architectural herita... More