Logging in the Cascade Mountains, near Seattle, Wash.: Boom Shingle Bo...
Photo copyrighted by Darius Kinsey. This record contains unverified, old data from caption card. Caption card tracings: Wash. Shagit R.; Wash. Cascade Mtns.; Lumbering Wash.; Shelf.
Skagit Power Development, Gorge High Dam, On Skagit River, 2.9 miles u...
Unprocessed Field note material exists for this structure: FN-5 Survey number: HAER WA-24-C Building/structure dates: 1961 Initial Construction
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Gorge High Dam, On Skagit River, 2.9 miles u...
Unprocessed Field note material exists for this structure: FN-5 Survey number: HAER WA-24-C Building/structure dates: 1961 Initial Construction
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, ...
Significance: The Newhalem Power Plant's purpose was to provide temporary power for construction of the first dam and City Camp (Newhalem). The Plant began operation 1921. In the early 1950s, was semiautomate... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, ...
Significance: The Newhalem Power Plant's purpose was to provide temporary power for construction of the first dam and City Camp (Newhalem). The Plant began operation 1921. In the early 1950s, was semiautomate... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Incline Railway, On Skagit River, 6.1 miles ...
Survey number: HAER WA-24-E Building/structure dates: HAER WA-24-E
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, ...
Significance: The Newhalem Power Plant's purpose was to provide temporary power for construction of the first dam and City Camp (Newhalem). The Plant began operation 1921. In the early 1950s, was semiautomate... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Gorge High Dam, On Skagit River, 2.9 miles u...
Unprocessed Field note material exists for this structure: FN-5 Survey number: HAER WA-24-C Building/structure dates: 1961 Initial Construction
Skagit Power Development, Gorge High Dam, On Skagit River, 2.9 miles u...
Unprocessed Field note material exists for this structure: FN-5 Survey number: HAER WA-24-C Building/structure dates: 1961 Initial Construction
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Ross Dam, 11.0 miles upstream from Newhalem ...
Picryl description: Public domain image of a power dam, cascade, free to use, no copyright restrictions.
Skagit Power Development, Incline Railway, On Skagit River, 6.1 miles ...
Survey number: HAER WA-24-E Building/structure dates: HAER WA-24-E
Skagit Power Development, Newhalem Powerhouse & Dam, On Skagit River, ...
Significance: The Newhalem Power Plant's purpose was to provide temporary power for construction of the first dam and City Camp (Newhalem). The Plant began operation 1921. In the early 1950s, was semiautomate... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Dam, On Skagit River, 6.9 miles upstr...
Unprocessed Field note material exists for this structure: FN-7 Survey number: HAER WA-24-F Building/structure dates: 1930 Initial Construction
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Diablo Powerhouse, On Skagit River, 6.1 mile...
Significance: Seattle City Light, during the construction of the Skagit Power Development, maintained a dedication to quality. This becomes evident in the ornamental details of Diablo Powerhouse. Unit 31 in t... More
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Ross Powerhouse, On Skagit River, 10.7 miles...
Survey number: HAER WA-24-G Building/structure dates: HAER WA-24-G
Skagit Power Development, Gorge Powerhouse, On Skagit River, 0.4 mile ...
Unprocessed Field note material exists for this structure: FN-4 Survey number: HAER WA-24-B Building/structure dates: 1925 Initial Construction Building/structure dates: 1951 Subsequent Work Building/struct... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More
Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric...
Significance: Developed over a 50 year time span by Seattle City Light, the Skagit River Hydroelectric Project consists of three large dams and power plants: Gorge, Diablo, and Ross. Associated with it is the ... More