Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Cottage No. 4, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Cottage No. 4, .5 mile north o...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Elevator House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Elevator House, .5 mile north ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Carpenter Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Carpenter Shop, .5 mile north ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Cottage No. 4, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Cottage No. 4, .5 mile north o...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Forebay, Gatehouse and Penstocks, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Intake Two, Tunnel Portals, Fo...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Machine Shop, .5 mile north of...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Cottage No. 1, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Cottage No. 1, .5 mile north o...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Transformer House, .5 mile nor...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Plant Two Powerhouse, .5 mile ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More

Snoqualmie Falls Hydroelectric Project, Cottage No. 1, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Cottage No. 1, .5 mile north o...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, Carpenter Shop, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, Carpenter Shop, .5 mile north ...

Significance: Construction of the Snoqualmie Falls Hydroelectric Project began in 1898 near the falls of the falls of the Snoqualmie River. It was the first power plant successfully constructed completely under... More

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA

Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, S...

Significance: The Snoqualmie Falls Hydroelectric Project was completed in 1898 and includes a cavity generating station, constructed some 250 feet below the surface of the river and about 300 feet from the edge... More