visibility Similar

code Related

Mississippi River 9-Foot Channel Project, Lock & Dam No. 17, Upper Mississippi River, New Boston, Mercer County, IL

description

Summary

Significance: The U.S. Army Corps of Engineers Nine-Foot Channel Project (1927-1940) represents the culmination of a 100-year effort to improve the navigability of the Upper Mississippi River between the mouth of the Missouri River and Minneapolis, Minnesota. This specific project arose as a response to the farm crisis of the 1920s. Proponents of the New Deal adopted the project and gave speed to its construction as a means of providing public enjoyment during the more general depression of the 1930s. By the 1940s, the completed project had converted over 650 miles of free-flowing river into a series of interconnected reservoirs which ensured enough water for fully loaded modern boats and barges to navigate the system. This constituted a significant alteration of the natural environment of the Upper Mississippi River. However, the project also brought economic benefits to the communities along and around the river corridor and lead to new recreational opportunities for the entire region. ...

Survey number: HAER IL-28

Building/structure dates: 1939 Initial Construction

label_outline

Tags

rivers navigation new boston mississippi mississippi river channel project lock dam upper upper mississippi river boston mercer mercer county illinois historic american engineering record massman construction company massman peterman company edward m rocho us army corps of engineers photo channel project ultra high resolution high resolution industrial history library of congress
date_range

Date

1969 - 1980
person

Contributors

Historic American Engineering Record, creator
U.S. Army Corps of Engineers
Massman Construction Company
Massman-Peterman Company
Rocho, Edward M
place

Location

New Boston ,  41.17031, -90.99681
create

Source

Library of Congress
link

Link

http://www.loc.gov/
copyright

Copyright info

No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html

label_outline Explore Massman Construction Company, Massman Peterman Company, Edward M Rocho

Topics

rivers navigation new boston mississippi mississippi river channel project lock dam upper upper mississippi river boston mercer mercer county illinois historic american engineering record massman construction company massman peterman company edward m rocho us army corps of engineers photo channel project ultra high resolution high resolution industrial history library of congress