Charlestown Navy Yard, Central Power Plant, Attached to northeast end of Building 107 at intersection of Third Avenue & Ninth Street, Boston, Suffolk County, MA

description

Summary

The Boston Redevelopment Authority hired William A. Owens to document all buildings in the Charlestown Navy Yard in 1977, most of which were exterior photographs.

Significance: Building 108 was originally built to supply electric power for Building 107, which housed the Yards and Docks Department (later the Public Works Department), but was almost immediately expanded as part of a congressionally-mandated effort to consolidate personnel and facilities. By 1908, the Central Power Plant had replaced a number of smaller power plants throughout the shipyard, and contained enough generating capacity to proved nearly all the electric power needed at the yard. The Central Power Plant supplied electric power for the shipyard until 1974, when the yard was decommissioned.

Survey number: HAER MA-90-34

Building/structure dates: 1902-1904 Initial Construction

Building/structure dates: 1905 Subsequent Work

Building/structure dates: 1907-1908 Subsequent Work

Building/structure dates: 1937 Subsequent Work

Building/structure dates: 1917 Subsequent Work

Building/structure dates: 1921 Subsequent Work

Building/structure dates: 1925 Subsequent Work

Building/structure dates: 1938 Subsequent Work

Building/structure dates: 1955 Subsequent Work

label_outline

Tags

boston charlestown navy yard charlestown navy yard central central power plant northeast northeast end intersection third avenue ninth ninth street suffolk suffolk county massachusetts navy yard power plants power industry military organizations boilers brick buildings steel structural frames naval yards and naval stations altman and taylor babcock and wilcox boston consolidated gas company justine christianson general electric liz harvey historic american engineering record mcginley hart and associates us navy us navy department of yards and docks photo ultra high resolution high resolution historic american landscapes survey historic american buildings survey shipyard power generator library of congress electric power
date_range

Date

1904 - 1980
person

Contributors

Historic American Engineering Record, creator
McGinley Hart & Associates, contractor
Harvey, Liz, transmitter
Stupich, Martin, photographer
place

Location

create

Source

Library of Congress
link

Link

http://www.loc.gov/
copyright

Copyright info

No known restrictions on images made by the U.S. Government; images copied from other sources may be restricted. http://www.loc.gov/rr/print/res/114_habs.html

label_outline Explore Altman And Taylor, Boston Consolidated Gas Company, Us Navy Department Of Yards And Docks

Topics

boston charlestown navy yard charlestown navy yard central central power plant northeast northeast end intersection third avenue ninth ninth street suffolk suffolk county massachusetts navy yard power plants power industry military organizations boilers brick buildings steel structural frames naval yards and naval stations altman and taylor babcock and wilcox boston consolidated gas company justine christianson general electric liz harvey historic american engineering record mcginley hart and associates us navy us navy department of yards and docks photo ultra high resolution high resolution historic american landscapes survey historic american buildings survey shipyard power generator library of congress electric power